Combustion air preheater for building material industry
Engineering, manufacturing and assembling of a heatexchanger with power of 210 KW
Heating of combustion air from 25°C to 90°C by Boiler feed water.
Heating of combustion air from 25°C to 90°C by Boiler feed water.
Essert Energiesparsysteme GmbH & Co KG
Rennstieg 6, D - 47802 Krefeld